- Energy Management
- Biomass & Bio Fuels
Skip to content
- top links
- Utility Usage & Cost Information
- Sustainability
- Clean Energy Research
- Clean Energy Research Center
- Combined Heat and Power Systems (CHP)
- Energy System Applications & Integration Lab (ESAIL)
- Geothermal Heat Pump Systems (Ground Source)
- OU Energy Flow Chart
- 2011 April - BioEnergy Conference
- 2008 May - Sustainable Project Development Workshop
- 2010 PV Manufacturing Initiative Proposal (not funded)
- Outdoor Lighting Pilot Project
- Wind Energy
- Solar Energy
- Biomass & Bio Fuels
- Environmental Impacts of Energy
- Home Energy Saving Information
- University Electrical System
Energy Management
Facilities Management Building
411 Pioneer Drive
Rochester,
MI
48309-4482
(location map)
System Literature & Maintenance Info
Operation / Cleaning Notes
KOB Pyrot Maint. Manual
Video of Oct 2012 Training (not done yet)
Boiler Training Presentation
Boiler Installation Photos (at end of PPT)
Video of Wood Chip Delivery
KOB Pyrot Brochure
KOB Pyrot Specification Sheet
KOB Pyrot Installation & Operation
Building Mechanical Dwgs
Building Electrical Dwgs
Civil Dwg C-1 of Silo
KOB Boiler Schematics
Silo Information Sheet
(1506WIR on pg 14)
Other Projects
10 MMBTU Boiler in Michigan 2008
6 MMBTU Boiler in Vermont
Operation / Cleaning Notes
KOB Pyrot Maint. Manual
Video of Oct 2012 Training (not done yet)
Boiler Training Presentation
Boiler Installation Photos (at end of PPT)
Video of Wood Chip Delivery
KOB Pyrot Brochure
KOB Pyrot Specification Sheet
KOB Pyrot Installation & Operation
Building Mechanical Dwgs
Building Electrical Dwgs
Civil Dwg C-1 of Silo
KOB Boiler Schematics
Silo Information Sheet
(1506WIR on pg 14)
Other Projects
10 MMBTU Boiler in Michigan 2008
6 MMBTU Boiler in Vermont
Wood Chip Boiler
With funding from Oakland University, the Department of Energy, and the SE Michigan Resource Conservation & Development Counsel, a high tech automated (1 million BTU / hr) wood chip boiler was installed at the east campus Shotwell-Gustafson Pavilion / OU INC facility. The project removed the building steam system and installed a hot water KOB wood boiler & chip handling system. The project also installed HVAC digital controls, new T8 lighting, induction pavilion lighting and LED outdoor lighting. Educational components include demonstration systems for the production of biodiesel, bio-ethanol and wood, or biomass, pellets.
Our project was made possible by the skilled work of the following vendors:
Boiler Supplier | Fink Machine |
Boiler Manufacturer | KOB |
Boiler Distributor | Viessmann |
Mechanical Contractor | Johnson & Wood |
HVAC Controls | Metro Environmental |
Engineering Consultant | Matrix Engineers |