Preliminary Wind Feasibility Study for a 50kW System
The feasibility study is being
offered by Entegrity Wind Systems. This is phase one of a three phase
process to install an Entegrity 50kW turbine. A video of an actual
installation near Toronto, Ontario can be
seen here. Below is the scope of this offering.
-
Site Plan: Site survey to
assess existing electrical infrastructure and determine optimal turbine
location
-
Wind Resource Report:
Investment Grade wind assessment for the proposed site
-
A determination of local
permitting requirements: Permitting authority, contact info, costs and
outline of basic process
-
Preliminary pro forma based
on estimated installation costs
-
Single-line electrical
diagram
Please fill out this
Wind Study Application Form, and
submit to Fran Cutler at Oakland University by May 9th for
consideration in the selection of one institution to receive this valuable study
free of charge.
Preliminary Wood Chip Boiler Feasibility Study
The feasibility study is being
offered by Jim Leidel of Oakland University. Below is the scope of this
offering.
-
Site Plan: Site survey to
assess existing heating systems infrastructure and possible location of a
boiler retrofit or new boiler house.
-
Wood chip resource
assessment: Using the best available data, a review of local wood
resources will be made with respect to the needs of the proposed boiler
installation.
-
A determination of local
permitting requirements: Permitting authority, contact info, costs and
outline of basic process
-
Preliminary pro forma based
on estimated installation costs
-
A simplified schematic
diagram
Please fill out this
Wood Boiler Study Application
Form, and submit to Fran Cutler at Oakland University by May 9th
for consideration in the selection of one institution to receive this valuable
study free of charge.
|